File:33KV sub-station at IIT Kanpur Pic1.jpg
Original file (3,000 × 4,000 pixels, file size: 3.38 MB, MIME type: image/jpeg)
Summary[edit | edit source]
Template:Information Template:Location 33KV substations were designed prior to the emergence of ring feeder arrangement. In the original design the substations were only feeding to the consumer side on the assumption of fixed load (at the consumer end).With the emergence of large sized fluctuations due to differential between planned load and actual load (due to temporal issues), the substations and the dependent distribution network started experiencing excessive voltage stress, leading to instrument heating and consecutive failures. Ring feeder arrangement ensured that the ensuing brown-outs and black outs were not a recurring event as the payload cycle changed during the 24X7X365 timeframe.
Licensing[edit | edit source]
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 14:48, 22 November 2022 | 3,000 × 4,000 (3.38 MB) | Dr Vinamra (talk | contribs) | Uploaded own work with UploadWizard |
You cannot overwrite this file.
File usage
There are no pages that use this file.
Metadata
IndicSessionManagement was here